Quick curing for backlack material

 

The “quick curing” process jointly developed with Baosteel replaces the original welding and riveting process, which can

reduce the NVH and iron loss of the driving motor of new energy vehicles and improve the efficiency;The curing time of

single iron core is 4-8min, which is characterized by fast, low cost and short development cycle.

 

                          

 

                 Automatic production line equipment and parts of products

 

 

 

 


Post time: Aug-10-2020